1. 9. PRE-COMMENCEMENT
    Meeting the team... 
    We'll introduce you to your Project Manager and Site Manager who will be with you for the duration of the project. ​
  2. 8. BUILDING CONTROL
    Local council's building... 
    We can work with the local council's building control teams but we are also flexible if you wish to appoint an independent surveyor.​
  3. 10. THE BUILD
    Turning design into reality...... 
    During the project we will ensure we follow the Building Regulations and Health and Safety protocols. Works will be undertaken as efficiently as possible. 
  4. 11. PROJECT MANAGEMENT
    Weekly meetings.... 
    Your project manager will meet you on site to keep you aware and updated of what is happening, check on the progress and ensure the project runs without delay.
  5. 13. RETENTION PERIOD
    Last visits...... 
    At this stage, on a period of 3-6 months we will visit the site and go through the required snagging works. Your project manager will arrange a programme for the works that need to be carried out. After this our project is finally complete.
  6. 12. PRACTICAL COMPLETION
    The final touches, handover...
    We sign off the property back to your care after carrying out a complete inspection of works.  We will provide you all manuals and warranties for the new fitted equipment in your renovated home. 
  7. 7. CONTRACT AND DEPOSIT
    Cost engineering and contracting ...
    Once the construction fee is agreed we generate a contract for the works. This is normally either FMB or a JCT contract.​
  8. 7. SCOPE OF WORKS
    Works detailed and pricing......
    We generate an itemised scope of works document together with the respective pricing.
  9. 3. PLANNING
    Submission...
    We prepare and submit your application for planning permission or permitted development. ​
  10. 2. THE DESIGN
    Formulating the idea...
    Our design team will then work with you to create that unique design you are looking for ensuring that we work to your budget.

  11. DESIGN
    ​PHASE


    DESIGN
    ​PHASE 2

    4. STRUCTURAL ENGINEER
    Calculations and construction methods...
    This information is needed for building control and for the Party wall discussions.
  12. 5. PARTY WALL AGREEMENT
    Surveyors work...
    We will recommend a surveyor who will issue the relevant notices as needed in the process.​
  13. 6. CONSTRUCTION DRAWINGS
    Floor plans, other drawings and schedules ...
    We produce all set of drawings and schedules to provide the site team with the information needed to undertake the work. ​

  14. DESIGN
    ​PHASE 1

    1. SURVEY
    Define the parameters... 
    All site investigations and survey work will be undertaken including measured building surveys, ground testing, structural appraisal such as party wall matters.